DOI 10.17586/0021-3454-2015-58-4-322-324
UDC 658.512.011.56
METHOD FOR EVALUATION OF TIME EXPENDITURES OF NUMERICAL CONTROL PROGRAM DEVELOPMENT FOR A WORKPIECE SET PRODUCTION USING A CAM SYSTEM
ITMO University; Department of Instrumentation Technology; Post-Graduate Student
Read the full article

Abstract. Peculiarities of the problem of time-expenditures evaluation for development of numerical control programs for CNC machines are considered. A new method for evaluation of time required to execute orders with a large set of workpieces is proposed. The method takes into account specifics of modern CAM systems and a wide range of CNC metal cutting machines used at enterprises.
Keywords: working time evaluation, CAM system, NC program, CNC, unification of construction and technological elements